Chapter 5. Energy
46
Bank Status
All eco PDU models support Bank level monitoring. The Bank Status section
allows you to set up a power management configuration for the individual
banks:
Threshold Settings
These fields are used to set the maximum, minimum, and fluctuation
threshold settings for Aggregate Current, Voltage, Power, and Power
Dissipation. If a range falls below the minimum setting, or exceeds the
maximum setting an alarm is triggered.
Breaker status (ON / OFF) displays here.