Atlantis Land A03-PS651 _MX01 Power Supply User Manual


 
OnePower Line Interactive UPS (EN)
A03-PS651 Pag. 26
provide expected
backup time.
due to recent outage.
3. The UPS’s battery is near
the end of its service life.
2. If the battery is near the end
of its service life, you have
to replace the battery.
The UPS operates
normally, but the
site wiring fault
indicator is lit.
1. Building wiring error such
as missing ground or hot to
neutral wire reversal.
1. Call a qualified electrician
in
order to correct the building
wiring.
A.1.2 Upsilon2000
Situation Solution
How to install
the
UPSilon2000.
Once started the UPS you can connect it to PC through
cable. Now you can install UPSILON2000 on the PC.
PC doesn’t
find the UPS.
1. Check if the cable is properly connected
2. Use the original cable
3. Launch Upsilon2000, then click on INSTALLATION and
check that TYPE OF COMMUNICATION is correct (COM).
A.1.3 Battery and Input Circuit Breaker
Situation Solution
Backup time
The battery backup time (sometime called battery reserve
time or battery autonomy) is the length of time the battery will
supply power to the load during a power failure. You can
check on the Appendix Backup Time.
Wich type of
battery does
UPS use?
12VDC- 7A/h.
How often do I
have to
change
battery?
Atlantis recommends to replace the batteries once a year.
Where can I
find batteries?
1. please contact Your reseller.
2. please contact directly Atlantis Land.
How can I
check the
Input Circuit
Breaker?
Under battery mode, when it¡soverload or short circuit,
UPS display UNUSUAL, then buzzer emits long sound
for 30 seconds, and automatically cut off output , then it
should be reset after eliminating fault.