SECTION - 3
INSTALLATION
3.1 INITIAL INSPECTION :
As soon as the power supply 1794 unit is unpacked, inspect for any damage that
may have occurred during transit. Save all packing material until inspection is
completed. If any damage is found, notify the carriers immediately. Our authorised
representatives should also be notified.
3.2 PHYSICAL CHECK :
This check should confirm that there are no broken knobs or connectors, that the
cabinet and panel surfaces are free of dents and scratches and the meters are not
scratched and cracked.
3.3 ELECTRICAL CHECK :
The power supply unit 1794 should be checked against electrical specifications.
An in-cabinet performance check will verify proper operation.
3.4 INSTALLATION DATA :
The power supply unit 1794 is shipped ready for bench operation. It is necessary
only to connect the unit to a rated source of power (120V AC) and it is ready for
operation.
3.5 LOCATION :
The power supply 1794 unit is fan cooled. Sufficient space should be kept around
the unit while in operation, so that unit do not remain in confined space or close to
another heating source.The ambient temperature of the area around the unit should
be less than 40°C.
3.6 RACK MOUNTING :
The unit is in rack size and can be rack mounted in a conventional rack using
standard mounting screws and the rack attachments optionally supplied.
3.7 INPUT POWER REQUIREMENTS :
The power supply 1794 unit may be operated continuously from input
voltage of 120V or 230V AC 47 - 63Hz power source. It is factory wired for 120V AC
operation.
3