Burris LH 6000 Server User Manual


 
Chapter 1 Introduction
4
5. Remove the plastic lock pawl (which engages and secures the bezel lock
mechanism) from the NetServer chassis front. Unfasten the control panel
from the chassis, reorient it, and then secure it to the chassis again. Install
the control panel bezel.
6. Install the slides in the rack, and install the NetServer in the rack.
7. Replace the power supply modules and hard disk drives.
8. For shipping HP racks, install the rack chassis retention bracket to secure
the NetServer to the rear of the rack.
9. Install the bezel mounting hardware, and install the new front bezel.
10. Install the Cable Management Arm.
11. Reconnect the AC power cord(s) and other external cables.
Warnings
Observe the warnings below to prevent harm to you or the NetServer. Also
observe all cautions and warnings in this document and other documents to protect
people, the NetServer, components, and other equipment.
WARNING Before removing the cover, always disconnect the power
cord(s) and unplug telephone cables. Disconnect the power
cord(s) to avoid exposure to high energy levels that may cause
burns when parts are short-circuited by metal objects, such as
tools or jewelry. Disconnect telephone cables to avoid
exposure to shock hazard from telephone ringing devices.
Note that the power switch does not turn off the standby
power. Disconnect the power cord(s) to turn off standby
power. If the backlight on the LCD display is on, standby
power is still on.