Cabletron Systems FOT-F3 Network Card User Manual


 
Page 4 - 5
TESTING AND TROUBLESHOOTING
2. Using another AUI cable (6), connect the other
LAN-MD (7) to another FOT-F3 (5) attached to the
same fiber optic link segment as the FOT-F3.
3. Select and run test 6 - SERVER on the LAN-MD
connected in step 1. Verify that this test passes.
The status on the LAN-MD should read 000 if
SQE is enabled or 001 if SQE is disabled. A
PASS TEST STATUS LED should also be lit on
the LAN-MD.
This LAN-MD now acts as the SERVER unit and
will act as a packet echoer when used with
another LAN-MD.
4. Select and run test 4 - NODE on the LAN-MD
connected in step 2.
Verify that this test passes. At least 100 packets
should be sent and received with no errors. The
packets will be received and sent back from the
SERVER LAN-MD that was left running on the other
segment.
When the FOT-F3 has successfully completed this test,
the units are ready for normal operation. If any failures are
noted, please contact Cabletron Systems’ Technical
Support.