D-Link DFE-916X Switch User Manual


 
Unpacking and Setup12
hubs can be created in this way. The first and last hubs in the stack use
only one of the daisy-chain ports, while the others use both.
Daisy-Chain OUT Port
Works in conjunction with the Daisy-Chain IN Port (see above). Con-
nect this port to the Daisy-Chain IN Port of the next hub in the stack
(usually placed immediately below it), using the enclosed daisy-chain
cable.
Fan
Provides air circulation and heat dissipation.
AC Power Connector
For the power cord.
Installing the Hub
Installation
The site where you install the hub stack may greatly affect its performance.
When installing, consider the following pointers:
Install the hub stack in a fairly cool and dry place. See Appendix B,
Specifications, for the acceptable temperature and humidity operat-
ing ranges.
Install the hub stack in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.