Edimax Technology ES-5224RM+ Switch User Manual


 
User Manual
Publication date: July, 2006
Revision A2
10
2. Installation
2-1. Starting 24 Fast Ethernet + 2 Gigabit L2 Managed Switch Up
This section will give users a quick start for:
- Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
Wear a grounding device to avoid the damage from electrostatic discharge
Installing Optional SFP/GBIC Fiber Transceivers to the L2 Managed Switch
Note: If you have no modules, please skip this section.
Connecting the SFP/GBIC Module to the Chassis:
The optional SFP/GBIC modules are hot swappable, so you can plug or unplug
it before or after powering on.
1. Verify that the SFP/GBIC module is the right model and conforms to the
chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fi
g
. 2-1 Installation of O
p
tional SFP/GBIC Fiber T
r
ansceive
r