EMC DS-xxB2 Switch User Manual


 
12
EMC Departmental Switch DS-xxB2 Into Third-Party Racks
Installing the DS-xxB2 Rails
Assembling the Rails
To assemble the rails:
1. Place the front rail down on a table.
2. Insert the slots of the rear adjustable rail onto the threaded posts
on the front rail. Be sure that the lip on the top of the rear
adjustable rail slides over the top of the slot on the front rail,
thereby capturing the ac power cord.
3. Secure the adjustable rail to the front rail with two #10 flat
washers and M5 keps nuts. Leave the keps nuts finger tight (see
Figure 11).
Figure 11 Location of Keps Nuts
4. Determine where in the rack/cabinet you will locate the switch.
5. Adjust the length of the rail to fit between the channels in the
rack/cabinet.
EMC2066S
Keps
Nut