Extron electronic YCS 100 Power Supply User Manual


 
YCS 100 • Installation and Operation
Installation and Operation, cont’d
2-16
YCS 100
Figure 2-15 — Jumper on YCS 100 internal board
N
When the YCS is delivered from the factory, a shunt is
attached to one prong of the jumper. This shunt is used
to enable the jumper in step 4.
4. Enable (close) the CR8 jumper by placing the shunt on both
prongs, as shown below.
Open Closed
Figure 2-16 — Enabling the CR8 jumper
5. Replace the YCS cover, using the screws that you removed.
6. Connect and power on all attached devices, then power on
the YCS 100.
A
Appendix A
Specifi cations, Part Numbers,
and Accessories
Specifi cations
Included Parts
Accessories