g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc 75/88 Operating Manual
SG Series
10, 20, 30 & 40 kVA
7.4.7 Restore to normal operation after “total off”
View of the panel after pressing the button “total off”.
• All Contacts are open;
• Rectifier
,
Inverter
and
Static-Switch
shutdown.
First operated unit All other units of the system
1. Reset “total off” by pressing and holding the “total off” button and then the
“
inverter on
”
( I )
key, on any of the Units simultaneously, until Load is supplied
from Bypass and the Rectifiers start.
•
System output connects to Bypass Utility.
• Rectifiers start with blinking LED.
• At the end of Soft-start the LED’s remains lit.
•
The LCD screen
on all Units shows: “
LOAD ON BYPASS
”.
First operated unit All other units of the system
2. Connect the Battery to all Units by closing the external Battery Switch(es) or
Fuses
.
Continue ►