40 HP BladeSystem p-Class Enclosure Installation Guide
On the server blade management module:
•
•
•
•
•
•
The upper Management Link connects to the upper enclosure.
The lower Management Link connects to the lower enclosure.
The iLO port connects to the iLO network.
On the power management module:
The right management link connector connects to enclosures above the
module.
The left management link connector connects to enclosures below the
module.
Additional guidelines for a 42U solution
Observe the following additional guidelines for configuring a full-rack 42U
solution with two pairs of mini bus bars:
You must set the power configuration switches to establish the two power
zones. Refer to Power configuration switches (on page 72
) in this guide.
• You must cable the power management module in zone 2 (upper pair of mini
bus bars) to both adjacent server blade management modules, above and
below. This connection enables system management to establish a full-rack
topology.
Connecting the management module cables
NOTE: This section applies only to systems that are configured with an
enhanced server blade enclosure.