IBM 4J Webcam User Manual


 
Parameter Description Value
submitter Locate the Processes to
select by the node
specification (the Sterling
Connect:Direct node name)
and user ID of the Process
owner. The length of this
parameter is unlimited.
(node specification, userid)|generic |(list)
node specification, userid—Specifies the node
specification (the Sterling Connect:Direct
node name) and user ID.
generic—Specifies a nonspecific value for
node specification and user ID. This generic
value, containing pattern-matching
characters, evaluates to a list of zero or more
node specifications and user IDs.
list—Specifies a list of node specification and
user ID pairs. Enclose the list in parentheses,
and separate each value with a comma.
detail Specifies the type of report
(short or detailed) that
Sterling Connect:Direct
generates for the selected
Processes.
yes|no
yes—Generates a detailed report.
no—Generates a short report. This is the
default.
The following command displays a short report for the specified Process number:
select process pnumber=9 detail=no;
Output from the command is displayed in the following table:
===================================================================================
SELECT PROCESS
===================================================================================
PROCESS NAME NUMBER USER SUBMITTER NODE QUEUE STATUS
-----------------------------------------------------------------------------------
PR01 9 root cd.unix.pj EXEC EX
===================================================================================
The following command displays a detailed report for the specified Process
number:
select process pnumber=9 detail=yes;
Output from the command is displayed in the following table:
===================================================================================
SELECT PROCESS
===================================================================================
Process Name => pr01 Class => 9
Process Number => 9 Priority => 8
Submitter Node => cd.unix.pj PNODE => cd.unix.pj
Submitter => sub1 SNODE => cd.unix.pj
Retain Process => no Header Type => p
Submit Time => 19:52:35 Schedule Time =>
Submit Date => 05/22/1996 Schedule Date =>
Queue => EXEC
Process Status => EX
Message Text =>
-----------------------------------------------------------------------------------
Chapter 1. Controlling and Monitoring Processes 25