148 Hardware Maintenance Manual: IBM PC Server/Enterprise Racks
Figure 64. Installing two Rack PDUs and the blank filler panel
7. Install the 1U blank filler panel
1 on the front of the rack cabinet at the same U
level as the Rack PDU. Use two M6 screws that come with this option.
Proceed to Cabling your PDUs on page 173 for instructions on how to cable
your Rack PDU.
Cabling your PDUs
Cable routing differs between horizontal and vertical Rack PDU installations. Refer to
Cabling instructions for vertical-mount PDUs on page 150 or Cabling instructions
for horizontal-mount PDUs on page 151 as appropriate for your installation.