MGE UPS Systems EX 5 RT 3:1 Power Supply User Manual


 
34007724EN/AA - Page 21
2. Installation
2.7 Connections of input/output power cables
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the battery circuit breaker 12 and that the upstream protection devices
(Normal and Bypass AC sources) are open ("0").
Comet EX RT UPS always comes from factory with Normal and Bypass AC inputs already connected together, using a
bridge.
Use included insulated ferrules with stranded wires.
To access the connection terminal blocks,
see section 1.2 "Rear panel":
1 - Remove the terminal block cover
(5 screws),
2 - Insert the Normal AC cable through the
cable gland,
3 - Connect the 5 wires to the Normal AC
terminal block,
Always connect the earthing
wire first.
4 - Insert the output cable to the load
through the output cable gland,
5 - Connect the 3 wires to the output
terminal block,
6 - Refit the terminal block cover and tighten
the cable glands,
7 - Secure the junction Input/Output box to
the rear of the power module by means of
the 3 screws.
UPS with common Normal and Bypass AC sources
1
4
2
5
3
6
1
6
1
1
6
6
7
R
e
c
t
i
f
i
e
r
I
n
p
u
t
L
2
L
1
L
1
B
y
p
a
s
s
I
n
p
u
t
N
2
L
2
N
1
L
3
O
u
t
p
u
t
N
L
R
e
c
t
i
f
i
e
r
I
n
p
u
t
L
2
L
1
L
1
B
y
p
a
s
s
I
n
p
u
t
N
2
L
2
N
1
L
3
O
u
t
p
u
t
N
L
R
e
c
t
i
f
i
e
r
I
n
p
u
t
L
2
L
1
L
1
B
y
p
a
s
s
I
n
p
u
t
N
2
L
2
N
1
L
3
O
u
t
p
u
t
N
L
Card Settings
RS232 Download
66074
UPS
data
Reset
100 10
1 2
ON
ETHERNET
IP=
MAC=00E0D8FF855E
N
O
R
M
A
L
φ
1
6
7
7