MGE UPS Systems 100 Power Supply User Manual


 
Figure 2-3: Circuit Diagram for 125VA-1000VA 240/120VAC Input.
Installation
Topaz 100 Ultra-Isolator Transformer
page 2 — 4
X1
X3
X2
X4
G
H1
H1-A
H3
H2
H4
H1
H1-A
H3
H2
H4
X1
X3
X2
X4
G
240V
INPUT
120V
INPUT
LINE
NEUTRAL
GROUND
LINE
* NEUTRAL
GROUND
120V
OUTPUT
240V
OUTPUT
LINE
LINE
LINE
LINE
T1
FILTER BOARD
IL
IN
L
N
LOAD
F1
SHIELD
OUTPUT
HARDWIRE CONNECTION DIAGRAM
240/120VAC OUTPUT 60Hz
GROUND STUD
(BOTTOM OF ENCLOSURE)
NOTE: UNIT FACTORY WIRED FOR 120VAC INPUT AND OUTPUT.
CHANGING FROM AN INPUT OF 120VAC TO AN INPUT OF 240VAC
ON MODELS RATED AT 1000VA AND BELOW, REQUIRES THAT THE
INPUT FUSE BE CHANGED AS INDICATED. A FUSE RATED AT 240VAC
AND THE CORRECT AMPERAGE HAS BEEN PROVIDED WITH THE TOPAZ 100.
15
2
6
3
7
4
8
CORE
* NEUTRAL (OR LINE IF X4-G JUMPER IS REMOVED.
SEE NOTE AT BOTTOM OF PAGE.)
NOTE: IF YOU DESIRE TO HAVE THE OUTPUT NEUTRAL UNGROUNDED, THE BONDING JUMPER CONNECTOR BETWEEN OUPUT TERMINAL
X4 AND GROUND MAY BE REMOVED. NOTE HOWEVER, THAT THIS WILL SIGNIFICANTLY REDUCE THE COMMON-MODE NOISE ATTENUATION
OF THE ULTRA-ISOLATOR. REMOVING THIS BOND WILL ALLOW FOR 240VAC LINE TO LINE APPLICATIONS AND PEOVIDE ISOLATION.
#16 AWG
#16 GREEN
GROUND
GROUND
LUG
RATING
F1
(120V)
F1
(240V)
250VA
500VA
750VA
1000VA
250V
3A
250V
1.5A
250V
6A
250V
3A
250V
12A
250V
6A
250V
8A
250V
4A
Recommended
Minimum Wire Size
# 14 GA.
# 14 GA.
# 14 GA.
# 14 GA.
# 16
# 16
# 16
# 16
WIRE
SIZE
125VA
250V
1.5A
250V
.75A
# 14 GA.
# 16
125VA - 1000VA 240/120VAC INPUT