GS716T/GS724T Hardware Installation Guide
Installation 4-15
v1.0, January 2011
5. Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.
Step 3: Checking the Installation
Before applying power perform the following:
• Inspect the equipment thoroughly.
• Verify that all cables are installed correctly.
• Check cable routing to make sure cables are not damaged or creating a safety hazard.
• Ensure all equipment is mounted properly and securely.
Figure 4-1