Nortel Networks 555-7101-215 Network Router User Manual


 
Part 2: 702t Server Hardware Installation v
Publication history
May 2003
Standard 1.0 issue for CallPilot 2.02. Appendix A
on the EMC emission level protection has been
added to the document. Information on single-point
grounding has been added to Chapter 3, “Installing
the server and connecting the peripheral devices”.
October 2002
Standard 1.0 of the CallPilot Installation and
Configuration, Part 2: 702t Server Hardware
Installation is issued for general release.