Nortel Networks P0605618 Server User Manual


 
Preparing for installation Standard 1.0
26 CallPilot
Installation overview
Introduction
This section provides an overview of the steps required to install the 1001rp
server and peripheral devices.
Installation checklist
The following checklist identifies the tasks that must be performed when
installing the CallPilot server. For detailed instructions, see Chapter 4,
Installing the server and connecting the peripheral devices.
When you are finished, continue with Part 3 of the CallPilot Installation and
Configuration binder.
Step Description Check
1 Ensure that you have reviewed the Installing CallPilot section
in Part 1 of the CallPilot Installation and Configuration binder,
and completed stage 1 of the Installation checklist.
2 Unpack the server, and ensure you have all the items you need
(see page 29).
Complete the following checklists that are provided in Part 1 of
the CallPilot Installation and Configuration binder:
CallPilot software media and documentation checklist
CallPilot server hardware checklist
3 Remove the front bezel and server cover, and inspect the
interior (see pages 31 and 35).
4 Replace the server cover.
5 Install the power supply modules in the server (see page 40).