PANDUIT DPoE Power System User’s Guide Issue 1.0
Part Number: PN380
Table 7: PANDUIT Corporation Contact Information
PANDUIT Technical Support Fax: 1-708-444-6993
E-mail: cs@panduit.com
For Installation Instructions in Local Languages
and Technical Support
www.panduit.com/resources/install_maintain.asp
Worldwide Subsidiaries and Sales Offices www.panduit.com
Have all tools, wire, cables, hardware, etc., within easy reach. To the extent possible, ensure a clean
(free of debris, dust, foreign material, etc.) work environment. Care should be taken in the installation
process to prevent wire clippings from getting into the equipment.
NOTE:
If possible, the rectifiers should remained sealed in their shipping boxes
until the chassis wiring is complete.
Power Plant Mounting and Wiring
WARNING:
Ensure all AC and DC power sources are off and disconnected.
Mechanical Mounting
The DPoE Power System chassis is installed in a standard EIA 19” rack.
It is recommended that one person lift the chassis into the proper rack place while another person installs
the supplied mounting screws. Tighten the screws with a torque wrench to the setting according to Table
6: Recommended Torque Settings.
Mounting Brackets
In shelf
distribution
Figure 4: Chassis (Front View)
Slots for Rectifiers
AC Input
Tighten the cord bracket around each IEC320 cord as shown in Figure 5: Cord Bracket. Plug the cord
into the proper receptacle on the back of the chassis (See Figure 6: Chassis (Rear View) - AC
Connections), then secure the cord bracket to the chassis using the provided screws (See Figure 7:
Securing Cord Bracket to Chassis).
8