Pelco C549M-A Switch User Manual


 
6-4 C1510M-A (2/03) SECTION 6
L
link cameras
see
cameras
looping
see
jumpers
M
manual
directory of, iii
introductory notes, ii
introduction, proper, iv
MON, keyboard monitor key, 5-5, 5-6
monitors
access to
alarms, 2-8
enabling, 2-10
cameras, 2-15
keyboards, 2-15
sequence cameras, 2-9
display of
alarms, 3-6
SAT program menus, 2-6 to 2-18
sequences, 3-3
local
programming of, 2-8 to 2-10
SAT, 1-3
system example hookup, 4-2
monitor-outs
see
BNCs
multiplexer
example, 4-11
N
NEXT, keyboard sequence key, 5-5, 5-6
O
O (off), sequence status indicator letter
see
sequence status, listing of
override function, 2-15
P
patterns
programming
see
programming, operational
viewing
see
cameras, viewing
PATTERN, keyboard pattern key, 5-5, 5-6
PGM, keyboard program key, 5-5, 5-6
PRESET, keyboard preset key, 5-5, 5-6
PREV, keyboard sequence key, 5-5, 5-6
presets
creating
see
programming, operational
viewing
see
camera, viewing
P (continued)
programming
9760 MGR-SAT programming, 2-19
alarm file, 2-21
cameras file, 2-20
comms file, 2-19
link cameras file, 2-20
configurations, 2-1 to 2-3
discussion of, preliminaries, 2-1
accessing SAT main menu
from SAT keyboard, 2-1
from 9760 keyboard, 2-2
operational
patterns, 2-17
presets, 2-16
zones, 2-18
SAT menus, 2-4
menu layout, discussion of, 2-5
access menu, 2-15
alarm menu, 2-12
auxiliary menu, 2-14
camera menu, 2-6
monitor menu, 2-8
ports menu, 2-13
time-date menu, 2-11
PTZ functions
see
cameras, controlling
R
receivers
control types, 1-4
wiring of, 1-4
reset, front panel
see
defaults, important
remote keypad connections
see
keyboards, SAT, remote
S
SAT
definition of, i
description of, iv
front view, i
models, 5-7
rear view, i
system environment, ii
menu programming
see programming, SAT menus
relationship to 9760, iv
section headings
see manual, directory of
sercom port, 1-1, 1-2, 2-19
system example, 4-1 to 4-10
configuration of
alarm inputs (SAT), 4-7
alarm monitors (9760), 4-8
com link, 4-3
keyboard, 4-2
link inputs, 4-4
link cameras file, 4-5
monitor, 4-2
operation, 4-9
tie lines, 4-6
overview, 4-1
sequences
creating, 3-3
operating, 3-3
specifications, 6-2
status sequence, listing of, 3-3
T
tie lines, video
alarm response and, 2-12
availability, 3-5
configuring
SAT SIDE
monitor menu, 2-9
9760 SIDE
cameras file, 2-20
installing, 1-2
order, importance of, 1-2
programming configurations and, 2-1 to 2-3
use defined, 1-2
use in system example, 4-1, 4-6, 4-9
warning,
see
“IMPORTANT”, 3-4
V
video
cable requirements, 1-3
loop-thru option
see
connectors, video, input
W
wall block
discussion of, 1-2
part of KBDKIT, 5-7
warranty and return information, 6-5
wiring, communication
SAT to CC1, 1-2
cable identification, 5-1
discussed, 1-2, 4-3
system wiring example, 4-3
tutorial, 5-1
Z
zones
defined, 2-18
programming
see
Programming, operational