Polycom RMX 4000 Hardware Guide
1-9
• Always keep the rack’s trays and card’s slots closed when not
servicing, to maintain proper cooling.
Installing the RMX 4000
The following procedures have to be performed to install the RMX 4000 in
your site:
• Unpacking the RMX 4000
• Installing the RMX in a rack or as a standalone
• Connecting the RMX 4000 to the power source
• Connecting the network (LAN, IP and ISDN) cables to the RMX
Unpacking the RMX 4000
To unpack and lift the RMX 4000:
1 When you receive the RMX 4000 packing case, inspect the equipment
for damage and verify that the components match the packing slip.
2 The RMX 4000 is shipped in a packing case with Stratocell®
packaging, and the top cover must be unlocked and lifted where the
RMX is placed on the inside of an anti-static plastic bag.
3 Open the top cover of the packing case.
Two boxes are placed on the top Stratocell®, labelled:
— Installation Accessories. This kit contains the power cables and a
USB Key.
— Rack Installation Accessories. This kit contains the accessories for
the 19” & 23” racks as follows:
Table 1-7 19” & 23” Rack Installation Accessories Package
Item ID Description Quantity
MEC2474A-L0 Chassis runner for rack installation
on the RMX 4000. 19” & 23” racks
both require that these runners be
installed on the rack.
2
MEC2475A-L0 23" bracket to be fitted to the front of
the RMX 4000.
2