Premier Mounts XL6000CM Projector Accessories User Manual


 
XL6000CM
Page 4 Installation Instructions
1. Separate the Upper Bridge from the Base Box
by removing the six (6) M6 x 12mm Phillips Head
screws three on each side (Figure 1).
Upper Bridge
Base Box
Figure 1
Ceiling Wood Stud
Ceiling
Surface
#14 x 2” Wood Screws
Upper Bridge
2. Use the appropriate slot openings for single wood
stud mounting, depending on your ceiling
configuration. The adjustable channel slots will
allow you to fine tune the final orientation of the
projector.
3. Secure the Upper Bridge to the center of the stud on
the ceiling structure at this time using two (2)
#14 x 2” wood screws (supplied).
Mounting Slot
4. Attach the Base Box to the Upper Bridge and
secure with the six (6) M6 x 12mm Phillips
Head screws (Figure 3). DO NOT TIGHTEN
THESE SCREWS YET.
Figure 2
Ceiling Installation
Figure 3
Ceiling Wood Stud
Ceiling
Surface
Base Box
M6 X 12mm
Phillips Head
Screw