I
NSTALLING
THE
S
WITCH
4
I
NSTALLING
THE
S
WITCH
The EZ Switch 10/100 can be placed on a desktop or shelf
and stacked with other devices using the provided 4 rubber
foot pads
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents
of the box to be sure you’ve received the following
components:
• EZ Switch 10/100 SMC-EZ6505TX or
SMC-EZ6508TX
• Appropriate DC power adapter
• Four rubber foot pads
• SMC Warranty Registration Card
•This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when
choosing a location:
• Select a suitable location for the switch:
• It should be accessible for installing, cabling and
maintaining the switch.
• The temperature and humidity should be within
the ranges listed in the specifications.
• The status LEDs should be clearly visible.