Sun Microsystems 5.1.3 Network Card User Manual


 
Chapter 7 Section 7.6
Implementing the VSAM eWay Sample Projects Building and Deploying the prjVSAM_JCD Sample Project
VSAM eWay Adapter User’s Guide 92 Sun Microsystems, Inc.
Having no content in these files causes the operation to read all records.
2 Verify the output data by viewing the sample output files. See “About the VSAM
eWay Sample Projects” on page 61 for more details on the types of output files
used in this sample Project. The output files may change depending on the number
of times you execute the sample Project, the input file, and also the content of your
database table.
7.6 Building and Deploying the prjVSAM_JCD Sample
Project
The following provides step-by-step instructions for manually creating the
prjVSAM_JCD sample Project.
Steps required to create the sample project include:
Creating a Project on page 92
Creating the OTDs on page 92
Creating a Connectivity Map on page 94
Creating the Collaboration Definitions (Java) on page 95
Create the Collaboration Business Rules on page 98
Binding the eWay Components on page 105
Creating an Environment on page 106
Configuring the eWays on page 107
Creating the Deployment Profile on page 110
Creating and Starting the Domain on page 111
Building and Deploying the Project on page 112
Running the Sample on page 112
7.6.1 Creating a Project
The first step is to create a new Project in the Enterprise Designer.
1 Start the Enterprise Designer.
2 From the Project Explorer tree, right-click the Repository and select New Project. A
new Project (Project1) appears on the Project Explorer tree.
3 Click twice on Project1 and rename the Project (for this sample, prjVSAM_JCD).
7.6.2 Creating the OTDs
The sample Project requires three OTDs to interact with the VSAM eWay. These OTDs
include: