Telect T3 Network Card User Manual


 
Issue A Rev 2 108469 Telect, Inc.
4-1
IN-SERVICE PATCHING
To temporarily connect an NE or DCS circuit to an alternate DCS or NE
circuit on the same or a different DNI-3 panel or DSX without disrupting
service, follow the steps below, using the Twist Lok Jacks (TLJs) on the
front of the appropriate DNI-3 panels and the following additional equip-
ment:
Four Mini-WECO patch cords (Mini-WECO plug at each end)
Two 75-ohm Mini-WECO terminating plugs
One dual bridging office repeater (BOR), or two single BORs
Step Action
1. Using one Mini-WECO patch cord:
a. Insert the plug of one end into BOR position 1, INPUT.
b. Insert the plug of the other end to the monitor TLJ at the first lo-
cation.
2. Using a second Mini-WECO patch cord:
a. Insert the plug of one end into BOR position 1, OUTPUT.
b. Insert the plug of the other end into the IN TLJ at the second lo-
cation.
3. Using a third Mini-WECO patch cord:
a. Insert the plug of one end into BOR position 2, INPUT.
b. Insert the plug of the other end into the monitor TLJ at the sec-
ond location.
4 User Functions