Xantrex Technology ACCB-L-L1 Power Supply User Manual


 
Installation
2–2 973-0031-01-01 Rev A
Preparing for the Installation
Code Compliance
Governing installation codes vary depending on the location and type of
installation. Electrical installations must meet local and national wiring codes.
Installations of this equipment should only be performed by skilled personnel
such as qualified electricians and Certified Renewable Energy (RE) System
Installers. For a list of Xantrex Certified RE dealers, please visit our website at
www.XantrexREdealers.com.
Installation Tools and Materials
Tools Required The following tools may be required for installing this equipment:
Wire strippers
Assorted open-end wrenches or socket wrench and fittings
Torque wrench
Electrical tape
Multimeter (AC/DC volts, frequency)
Assorted Phillips screw drivers
Allen/Hex head driver set
Slotted screw driver
Level
Pencil
Utility knife
Hardware /
Materials Required
The following materials may be required for completing this installation:
Conduits (flexible conduit is recommended), bushings, wire nuts, and
appropriate fittings for wire runs
Electrical wire of appropriate size and length
Breaker panels (if used)
Additional circuit breakers (if required)
Ground busses, bars, and/or rods
Six appropriately sized wood screws or lag bolts and washers
Important:
Before installing the Long AC Conduit Box, read all instructions and
cautionary markings located in this guide and in your inverter manual.
Important:
Be sure to obtain the appropriate permits, if necessary, prior to starting this
installation.