Basic Setup Procedure
Table 2-1 provides a summary of the basic setup procedure with
references to the relevant sections in this chapter. Refer to this table if you
are unfamiliar with the installation requirements for the power supply.
Complete each step in the sequence given.
Table 2-1
Basic Setup Procedure
Step Description Action Reference
1 Inspect Inspect the power supply. “Step 1: Inspecting and Cleaning”
on page 2–3.
2 Install Install the power supply
(benchtop or rack mount).
Ensure adequate ventilation.
“Step 2: Location and Mounting” on
page 2–4.
3 Connect Input
Power
Connect AC input power. “Step 3: Connecting AC Input
Power” on page 2–5.
4 Select Wires Select wires that are correctly
rated for the maximum DC
output current.
“Step 4: Selecting Load Wires” on
page 2–6.
5 Test Perform functional tests for
voltage mode operation, current
mode operation, and front panel
controls.
“Step 5: Performing Functional
Tests” on page 2–8.
6 Connect Loads Connect the load wires to the
DC output.
“Step 6: Connecting Loads” on
page 2–10.
7 Connect Remote
Sensing (if
required)
Connect remote sensing
connectors on power supply to
load.
“Step 7: Connecting Remote
Sensing” on page 2–13.