AEG 10000 Power Supply User Manual


 
54
bypass for the loads is done, i.e. activation of the manual
bypass operation, suspension of the supply for the load by the
UPS bus-bar.
The clearance of the voltage of each UPS is realised in the
low voltage distribution. Now the expansion resp. the
reduction of the parallel compound can be executed now.
Watch out for the bridge between “JP1” and JP2” and the
parallel operation line. The activation follows the steps in
chapter 9.3.1.
i
For deactivating the UPS in the parallel
compound just press the „OFF“ switch twice
behind each other. Like this the UPS-Systems
can be removed from the parallel operation
bus-bar.