Allied Telesis AT-9424T/POE Switch User Manual


 
7
Preface
This guide contains the installation instructions for the AT-9400 Layer 2+
and Basic Layer 3 Gigabit Ethernet Switches. This preface contains the
following sections:
“Product Documentation” on page 8
“Where to Go First” on page 9
“Starting a Management Session” on page 10
“Safety Symbols Used in this Document” on page 11
“Where to Find Web-based Guides” on page 12
“Contacting Allied Telesis” on page 13