Installing the Switch on a Desktop
You can install the AT-GS950/9POE switch on a desktop, in a rack, or on
a wall.
To install a switch on a desktop, perform the following procedure:
1. Remove all of the equipment from the package and store the
packaging material in a safe place.
2. Turn the switch over and attach the four rubber feet to the bottom of
the switch as shown in Figure 6.
Figure 6. Attaching the Rubber Feet
3. Turn the switch over again and place it on a flat, secure surface, such
as a desk or table, leaving ample space around the unit for ventilation.
Note
For cabling information, see Chapter 3, “Cabling the Network Ports”
on page 45.