Allied Telesis AT-GS950/8POE Switch User Manual


 
7
Figures
Figure 1: AT-GS950/8 POE Switch— Front and Back Panels .............................................................................................18
Figure 2: SFP Transceiver....................................................................................................................................................25
Figure 3: Port LEDs on an AT-GS950/8POE Switch............................................................................................................26
Figure 4: Power Workgroup Topology..................................................................................................................................30
Figure 5: Collapsed Backbone—Hub Topology....................................................................................................................31
Figure 6: Attaching the Rubber Feet ....................................................................................................................................38
Figure 7: Removing the Feet................................................................................................................................................39
Figure 8: Attaching Rack-Mount Brackets............................................................................................................................40
Figure 9: Mounting the Switch in a Rack..............................................................................................................................40
Figure 10: Attaching a Rack-mount Bracket for Wall mounting............................................................................................41
Figure 11: Attaching the switch to the wall ...........................................................................................................................42
Figure 12: Resetting the Switch............................................................................................................................................43
Figure 13: Connecting an RJ-45 cable.................................................................................................................................49
Figure 14: Removing a Dust Plug from an SFP Slot ............................................................................................................50
Figure 15: Installing an SFP Transceiver..............................................................................................................................51
Figure 16: Removing the SFP Cover....................................................................................................................................51
Figure 17: Inserting the Fiber Optic Cable............................................................................................................................52
Figure 18: Connecting the AC Power Cord ..........................................................................................................................53
Figure 19: RJ-45 Connector and Port Pin Layout.................................................................................................................65