Allied Telesis AT-GS950/8POE Switch User Manual


 
AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide
51
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place. See
Figure 15.
Figure 15. Installing an SFP Transceiver
5. Verify that the handle on the SFP transceiver is in the upright position,
as shown in Figure 16, to prevent inadvertently removing the
transceiver.
6. Remove the SFP cover as shown in Figure 16.
Figure 16. Removing the SFP Cover
1344
SFP SFP
CLASS 1
LASER PRODUCT
8R
78
100/1000Base-X
SFP Handle
1345
SFP SFP
CLASS 1
LASER PRODUCT
8R
78
100/1000Base-X
SFP Handle