AMX NXA-UPS1500 Power Supply User Manual


 
NXA-UPS1500 EPM Installation
27
NXA-UPS1500 Uninterruptible Power Supply
EPM - Installation and Operation
The packing condition and the external outlook of the unit should be inspected carefully before
installation. Retain the packing material for future use.
Unpacking
1.
Take the EPM out of the PE foam.
2. Remove the packing materials.
The EPM includes accessories for tower and rack mount (FIG. 25).
Selecting Installation Position
It is necessary to select a proper environment to install the unit, in order to minimize the possibility of
damage to the EPM and extend the life of the batteries. Please follow the instructions below:
1. Keep at least 20cm (8 inches) clearance from the rear panel of the EPM from the wall or other
obstructions (see FIG. 8 on page 12).
2. Do not block the air-flow to the ventilation openings of the unit.
3. Please ensure the installation site environmental conditions are in accordance with the EPM
working specifications to avoid overheat and excessive moisture (see FIG. 9 on page 12).
4. Do not place the EPM in a dusty or corrosive environment or near any flammable objects.
5. This EPM is not designed for outdoor use.
The EPM module is approx. 12.5~50 kgs, be cautious when unpacking and lifting the
unit to avoid injury.
FIG. 25 EPM Accessories for Tower and Rack Mount