990-1378
Installation Guide APC BC300 Series 10kW 208/450/480V UPS 3
Contents:
1.0 Introduction 4
1.1 Tools and Equipment Needed 4
2.0 Receiving, Unpacking, Moving
and Storing the UPS and Batteries 5
2.1 Receiving, Unpacking and Moving to Site 5
2.2 Storing the UPS and Batteries 5
3.0 Installation 6
3.1 Requirements on Site 6
3.1.1 UPS Footprint (measurements in inches & mm) 7
3.2 Installing the Conduit Connection Kit 7
3.2.1 Conduit Connection Kit Contents 8
3.2.2 Installing Pedestals 8
3.2.3 Installing Conduit Box and Base Covers 8
3.3 Installing the Maintenance Bypass Panel and UPS 9
3.3.1 Component Overview (door open) 14
3.3.2 Wire Terminals 15
3.3.3 Wiring Diagram for BC300 16
3.3.4 Single Line Diagram for BC300 17
3.3.5 External Connection Board 21
3.3.6 Communication Interface Board (Option) 22
3.4 Smart Slot and Connection of Triple Chassis 23
3.5 APC BC300 Triple Chassis 24
3.5.1 Safety Warnings 24
3.5.2 Product Description 24
3.5.3 Installing Management Products 25
3.5.4 Powering the APC BC300 Triple Chassis 26
3.5.5 Troubleshooting 27
3.5.6 Product Specifications 28
3.6 Installation of External Batteries and Battery Breaker 30
3.6.1 Battery Installation 30
3.6.2 Battery Replacement 33
4.0 Initial Start-up and Phase Check 34
4.1 Initial Start-up and Phase Check (Internal Batteries) 34
4.2 Initial Start-up and Phase Check (External Batteries) 35
5.0 Clearing the Events Log 37
6.0 Start-up and Shutdown Procedure 38
6.1 Start-up from Maintenance Bypass 38
6.2 Shutdown Procedure 39
7.0 Technical Specifications 40
7.1 APC BC300 Series 10kW Technical Data 40
7.2 Battery Specifications 41
7.3 Dimensions/Weight 42
8.0 How to Contact APC 43