InfraStruXure Site Planning, Installation, Start-Up 11
Installation Procedures
Join Adjacent Enclosures and Bolt
Enclosures to the Floor
Join adjacent enclosures
Bolt Enclosures to the Floor
To bolt the PDU and enclosures to the floor, follow these steps for each enclosure:
1. Remove the front and rear skirts on the enclosure.
2. Insert two bolts through each plate and the holes in the plinth, using the bolt plate (included).
Screw the bolts into the pre-installed anchoring hardware in the floor.
3. Tighten the bolts to 81 n·m, using a torque wrench.
S
ee also
To join NetShelter VX Enclosures, see the installation manual included with your
enclosures.
Proper anchoring hardware must be in place before starting this procedure.