Installation Procedures: Route and Attach Overhead Wiring
24 InfraStruXure Site Planning, Installation, Start-Up
5. From each NetShelter VX Enclosure, run the power cable of the appropriate APC power
management device out the roof of the enclosure, through the notch in the rear side of the
Shielding Trough, to the connector of the appropriate power cable from the PDU. Plug the two
connectors together, and twist them clockwise to lock.