InfraStruXure Site Planning, Installation, Start-Up 33
Configuration
Configure the InfraStruXure Manager
After you complete the installation and system start-up, configure the InfraStruXure Manager.
S
ee also
For instructions, see the manual included with your InfraStruXure Manager.
If you use PowerChute Network Shutdown (PCNS) software with your
InfraStruXure UPS, your UPS must have a connection to the “User LAN” (public
network) for PCNS to function correctly. If the Network Management Card installed
in your UPS is connected to the InfraStruXure Manager’s “APC LAN,” you must
install a second Network Management Card in your UPS and connect it to the “User
LAN” (public network) to use PCNS.