Heavy Duty Edge Switches Installation and User Guide(07/05)
38
mounting the unit on a vertical surface such as a wall or cabinet, or for securing the unit on
a table-top or shelf. Alternatively, metal mounting clips and screws are included for a
rugged and secure mounting in any orientation.
Installation of the Black Box Heavy-Duty LBHXXX Edge Switches is a simple
procedure. The installation location is dependent upon the physical layout of the Ethernet
network and associated cabling. Make sure the unit is installed in a location that is easily
accessible to an AC power outlet or the appropriate DC source and where cooling is not
inhibited. The green Power (PWR) LED must turn ON when power is applied.
3.2 LH1505-RACK for Rack Mounting of Heavy-Duty LBH Switches
For 19” rack-mounting of Black Box Heavy-Duty LBHXXX Edge Switches, a rack-mount
tray is available, the LH1505P-RACK. The Edge Switches are mounted with the DC power
jack in the back, with the fiber and the RJ-45 connectors in the front. Any mix of the Edge