Chapter 4. Installing DWZZH-09 Upgrade Kit
EK–SMDZS–UG. B01 4–3
Figure 4-3 Attach Tri-link to Cable
SHR-1109
2. Install and secure tri-link in storage port of right-hand SBB. Then install and
secure the opposite end of the cable in the storage port of the left hand SBB,
Figure 4-4.
Figure 4-4 Install Tri-link and Cable in Storage Ports of SBBs
SHR-1110
3. Install power cords in power supplies on unit.