Compex Systems RAID Network Card User Manual


 
Getting Started
2-1
Chapter 2
Getting Started
Getting started with the subsystem consists of the following steps:
Unpack the storage subsystem.
Identifying Parts of the subsystem.
Connect the SCSI Cables.
SCSI Termination.
Power on the subsystem.
Install Hard Drives.
2.1 Unpacking the Subsystem
Before continuing, first unpack the subsystem and verify that the contents of
the shipping carton are all there and in good condition. Before removing the
subsystem from the shipping carton, visually inspect the physical condition of
the shipping carton. Exterior damage to the shipping carton may indicate that
the contents of the carton are damaged. If any damage is found, do not re-
move the components; contact the dealer where the subsystem was pur-
chased for further instructions.
The package contains the following items: