Emulex NQTR0U-NATM Printer User Manual


 
Printer Server Installation 2-19
Print Test Page
The test page is a helpful tool that can be used to verify the connection
between the printer server and the printer. The test page contains the
following data:
reference when configuring the printer server. The print out contains
default and recently changed informationPrinter sServer nName
MAC Address
DD
efault remote pPrinter nName Node Nname
Hardware & fFirmware revisions NOS iInformation
SSoftware revision Network pProtocols
This procedure assumes that at least one printer is connected.
1) Verify the Emulex printer server has power.
2) Verify printer has power and is On-Line.
3) Disconnect power to the printer server.
4) Disconnect LAN cable.
5) Reconnect power to printer server.
6) The printout will occur within 90 seconds.
If no printout occurs, verify all connections and make sure printer shows
power ON, Ready and On-Line.
NOTE: If the printer is PCL or text only, the test printout
may contain PostScript commands.