![](http://pdfasset.owneriq.net/d/c0/dc0bd26a-ed03-420d-9ff3-e2407c738559/dc0bd26a-ed03-420d-9ff3-e2407c738559-bgc.png)
PoleVault Systems Installation • Introduction — Inventory Overview
1-10
Introduction — Inventory Overview, cont’d
d. Installation tools
To aid the professional installer, this checklist gives the tools recommended to complete the installation.
Tools should include, but are not confined to:
• Laser level, or two levels (large for screen installation, small for wall plates and projector mounts)
• Tape measure
• Stud nder
• Drill and drill bit set including a Unibit to cut through metal studs
• Extension drill bit (3/4" min. (1.9 cm), 4 to 8' length (122 to 244 cm), to drill through re-breaks)
• Socket set
• Pipe strap or wrapped pipe wrench
• Lineman’s pliers and wire strippers
• Standard screwdriver set and tweeker
• Cable cutters (to cut safety wire)
• Dry wall saw and hacksaw blade mounted on handle (for cutting ceiling tiles)
• Flashlight and safety goggles
• Razor knife
• 2" hole saw
• Painters tape (to mark up walls), pencil, and marker pen
• RJ-45 crimpers and RJ-45 connectors
• Voltage tester
• Fish tape, pull string, and electrical tape (for taping sh tape to pull string)
• Zip ties
• Vacuum cleaner
• Heat gun