GBC USP 13 Time Clock User Manual


 
7
Position front (#49) and rear (#56 & #48) supply stack guides so that the posts clear the
paper stack by about 1/16”. A stack of 2 to 3 inches is required.
Locate adjustable stack guide post (#59) so that the post is in line with the separating knife.
(Figure 13).
Install front guide rail (#55) so that there is about 1/8” to 1/4” clearance between the lift
being transferred and the front guide rail.
Cycle machine and check results.
48
56
49
59
29
55
108
TO BE IN
LINE
Figure 13
Figure 14