Document No. : SOP VV09 FA DIS-ASS’Y Station :
Name : Ver. : Date :
Fixture list(Fixture standard)
Qty
Working Instruction
If finding some defects, notice the gaffer and assistant
Point for attention:
::
:
Fixture list(Fixture standard)
Qty
Tabulator:_________
Issuing department:
Zhang Ying
IE
1. Disassemble SW/C , Fig.1 g.1
14” : 6070B0350501
15” : 6070B0351101
Sequence:123
2. Turn over the K/B , Fig.2
7(1/1)
Disassemble SW/C
①
①①
①
②
②②
②
2009/05/181.00
②
②②
②
3
Fig.1
Fig.2