Document No. : SOP VV09 FA DIS-ASS’Y Station :
Name : Ver. : Date :
Fixture list(Fixture standard)
Qty
Working Instruction
If finding some defects, notice the gaffer and assistant
Point for attention:
::
:
Fixture list(Fixture standard)
Qty
Tabulator:_________
Issuing department:
Zhang Ying
IE
10(1/1)
1. Disassemble LCM Cable CNTR。
2. Disassemble Camera CNTR。
Disassemble LCM Cable
2009/05/181.00
14’
15’
图一
图二
图三
Fig.1
Fig.3
Fig.2