Document No. : SOP VV09 FA DIS-ASS’Y Station :
Name : Ver. : Date :
Fixture list(Fixture standard)
Qty
Working Instruction
If finding some defects, notice the gaffer and assistant
Point for attention:
::
:
Fixture list(Fixture standard)
Qty
Tabulator:_________
Issuing department:
Zhang Ying
IE
CLOSED Status
OPEN Status
图一
图一图一
图一
23(1/1)
2009/05/181.00
Take out CPU
1. Put MB on supporting fixture.
2. Take down CPU from CPU SOCKET
with suck pen.
(take down it in counter clockwise)
Flat screw driver 1
suck pen 1
VV09 M/B B side supporting fixture 1
Fig.1
Fig.2