Hardware options installation 85
Completed SAS cabling:
21. Make sure any installed full-length expansion boards are seated in the retainer clip on the air baffle.
22. Install the access panel (on page 25).
23. Install the server into the rack.
24. Connect each power cord to the server.
25. Connect each power cord to the power source.
26. Power up the server (on page 23).
2U rack bezel option
The 2U rack bezel helps prevent any unauthorized physical access to the server in the rack configuration. To
access the hard drive cage, you must unlock and open the 2U rack bezel.
To unlock the 2U rack bezel, use the key provided with the kit.