InFocus SP-CEIL-UNIV Projector Accessories User Manual


 
ISSUED: 10-22-04 SHEET #: 055-9236-5 01-10-06
Visit the InFocus Web Site at www.infocus.com
5 of 11
Flush Mount Installation
Drill two 5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly (A) with two
#14 x 2.5" (6 mm x 65 mm) wood screws (F) and two flat washers (E) as shown in figure 1 or figure 2 depending
on joist orientation. Tighten wood screws (F) using 3/8" (10 mm) socket wrench until projector mount assembly (A)
is firmly attached.
Skip to step 7.
F
F
A
WOOD JOIST
FRONT OF
MOUNT
E
E
FRONT OF
MOUNT
WOOD JOIST
A
figure 1
figure 2
Tighten wood screws so that projector mount assem-
bly is firmly attached, but do not overtighten. Overtight-
ening can damage the screws, greatly reducing their
holding power.
Never tighten in excess of 80 in • lb (9 N.M.).
Make sure that mounting screws are anchored into the
center of the joist. The use of an "edge to edge" stud
finder is highly recommended.
WARNING