1
Quick Start
1 Install the hub(s).
Maximum stack: Six hubs
Rack requirements: Standard 19-in (48.26 cm), 1.5 EIA rack-mount
space for each hub
Shelf requirements: Support for 10 lbs (4.5 kg) per hub
12.3 lbs (5.6 kg) with uplink module and NMM
2 Connect the stack.
Use the cascade cables to connect multiple hubs.
You need to purchase cascade cables separately
from your network services supplier (see
Appendix B for more information).
Do not use UTP cabling to connect hubs.
3 Connect the devices.
Connect 100BASE-T4 devices to the hub using four-pair
Category 3, 4, or 5 unshielded twisted pair (UTP) cabling.
Maximum cable distance between a port and an attached
device is 100 meters.
4 Plug power cords into each hub, then check LEDs.
• Make sure the Pwr LED is lit for all hubs.
• Make sure the numbered port LEDs are lit for connected devices.
Pwr LED
Port LEDs