LevelOne GSW-2401TX Switch User Manual


 
6
3. Connect hub or PC to one port of the Switch using Category 3/4/5
UTP/STP cabling
4. Connect another hub or PC to the other port of Switch by following
the same process as described in Step3.
Notice:
Cable distance for Switch
The cable distance between Ethernet Switch and hub/PC
should not exceed 100 meter; fiber cable distance shall not
exceed 220 meter.
Make sure the wiring is correct
It can be used Category 3/4/5 cable in 10 Mbps operation. To reliably
operate your network at 100Mbps and 1000Mbps, you must use an
Unshielded Twisted-Pair (UTP) Category 5 cable, or better Data Grade
cabling. While a Category 3 or 4 cable may initially seem to work,it
will soon cause data loss.
Connecting to Network Backbone or Server
Connect to the Gigabit Ethernet ports with Category 5 copper cable or
fiber optic cable for uplinking to a network backbone or network server.
These ports operate at 1000Mbps in full-duplex mode. A valid
connection is indicated when the Link LED is light. The following
sections describe the function of LEDs on the front panel.
CPU LED
Color: Green
Label: Smart
Function: The LED light up steadily means CPU installed for
smart function
Power LED
Color: Green
Label: PWR
Function: The LED light up steadily means Power turned on.